ELA2 Usage Level Report Builder
Total hours / year savings
2,686 h
Quick inputs
A few quick questions — enough for an instant savings estimate.
Results & savings
Live results from the quick inputs above — matches workbook CALC1/Report.
Engineering level
As-is level
1.76
90.4%
Target level
3.68
58.2%
Production level
As-is level
1.25
97.6%
Target level
3.50
76.4%
Engineering time [%]
Share of time by work item — for this customer's calculated As-is (level 1.76) and Target (level 3.68) levels.
- 1. Specification
- 2. Framework conditions
- 3. Engineering
- 4. Design (drawing)
- 5. Quality check
- 6. Bill of material
- 7. Reports
- 8. Cabinet design
| # | Item | As-is | Target |
|---|---|---|---|
| 1 | Specification | 5.0% | 5.0% |
| 2 | Framework conditions | 3.0% | 3.0% |
| 3 | Engineering | 43.2% | 33.1% |
| 4 | Design (drawing) | 22.0% | 5.7% |
| 5 | Quality check | 2.8% | 1.5% |
| 6 | Bill of material | 2.8% | 0.0% |
| 7 | Reports | 2.8% | 0.3% |
| 8 | Cabinet design | 5.0% | 2.1% |
Production time [%]
Share of time by work item — for this customer's calculated As-is (level 1.25) and Target (level 3.50) levels.
- 11. Fitting
- 12. Panel modification
- 13. Labeling Devices
- 14. Wire Fabrication
- 15. Mechanical installation
- 16. Devices installation
- 17. Terminal strip assembly
- 18. Wiring
- 19. Testing
- 20. Packaging
- 21. Article (3D mockup)
- 22. Cabinet design
| # | Item | As-is | Target |
|---|---|---|---|
| 11 | Fitting | 1.6% | 0.9% |
| 12 | Panel modification | 8.8% | 4.4% |
| 13 | Labeling Devices | 10.9% | 6.0% |
| 14 | Wire Fabrication | 20.8% | 11.1% |
| 15 | Mechanical installation | 2.5% | 1.7% |
| 16 | Devices installation | 2.2% | 2.0% |
| 17 | Terminal strip assembly | 12.4% | 7.8% |
| 18 | Wiring | 26.7% | 24.1% |
| 19 | Testing | 7.1% | 6.4% |
| 20 | Packaging | 1.8% | 1.8% |
| 21 | Article (3D mockup) | 2.8% | 5.6% |
| 22 | Cabinet design | 0.0% | 4.7% |
| Engineering | Value | Panel production | Value | Total |
|---|---|---|---|---|
| As-is efficiency level | 1.76 / 90.4% | As-is efficiency level | 1.25 / 97.6% | |
| Target efficiency level | 3.68 / 58.2% | Target efficiency level | 3.50 / 76.4% | |
| Difference | 32.2% | Difference | 21.1% | |
| Saving potential engineering | $90,817 | Saving potential production | $63,600 | $154,417.37 |
Engineering metrics
- Engineering as-is level
- 1.76 (90.4%)
- Engineering target level
- 3.68 (58.2%)
- Difference
- 32.2%
- Saving potential
- $90,817
Production metrics
- Production as-is level
- 1.25 (97.6%)
- Production target level
- 3.50 (76.4%)
- Difference
- 21.1%
- Saving potential
- $63,600
Total savings
$154,417.37
Recommended offering
From workbook sheet “To be offered” — needed-from level compares against this customer's current and target levels above.
Improvements to engineering
15 of 15Electric P8 Professional
- Type
- Software
- Quantity
- 2
- Needed from level
- 1.50
Electric P8 basic training 5/8 days
- Type
- Training
- Quantity
- 2
- Needed from level
- 1.50
IT implementation
- Type
- Consultancy
- Quantity
- 1
- Needed from level
- 1.50
Setting up the EPLAN Project environment
- Type
- Consultancy
- Quantity
- 3
- Needed from level
- 1.50
Product workshop Electric P8
- Type
- Consultancy
- Quantity
- 4
- Needed from level
- 2.00
Creation of design data
- Type
- Consultancy
- Quantity
- 2
- Needed from level
- 2.00
Macro training
- Type
- Training
- Quantity
- 2
- Needed from level
- 2.50
Creation of design data
- Type
- Consultancy
- Quantity
- 2
- Needed from level
- 2.50
Cogineer/eBUILD or EEC
- Type
- Software
- Quantity
- 2
- Needed from level
- 3.00
Cogineer/eBUILD or EEC training
- Type
- Training
- Quantity
- 2
- Needed from level
- 3.00
Automated schematic creation with eBuild / Cogineer
- Type
- Consultancy
- Quantity
- 4
- Needed from level
- 3.00
Product structuring
- Type
- Consultancy
- Quantity
- 3
- Needed from level
- 3.50
Optimizing workflows
- Type
- Consultancy
- Quantity
- 2
- Needed from level
- 4.00
EPIS interface
- Type
- Software
- Quantity
- 2
- Needed from level
- 4.50
EPIS requirement workshop
- Type
- Consultancy
- Quantity
- 3
- Needed from level
- 4.50
Improvements to production
19 of 19Schematic derivations for production optimization
- Type
- Consultancy
- Quantity
- 2
- Needed from level
- 1.50
Pro Panel Professional
- Type
- Software
- Quantity
- 2
- Needed from level
- 2.00
Pro Panel Basic training 4 days
- Type
- Training
- Quantity
- 2
- Needed from level
- 2.00
Setting up the EPLAN Project environment 3D
- Type
- Consultancy
- Quantity
- 2
- Needed from level
- 2.00
Product workshop Pro Panel
- Type
- Consultancy
- Quantity
- 3
- Needed from level
- 2.00
Creation of design data 3D
- Type
- Consultancy
- Quantity
- 3
- Needed from level
- 2.00
Label printing machine
- Type
- Machine
- Quantity
- TBD
- Needed from level
- 2.50
Routing & Production Elements
- Type
- Software
- Quantity
- 2
- Needed from level
- 3.50
Wire Production Elements
- Type
- Software
- Quantity
- 2
- Needed from level
- 3.50
EPLAN Smart Wiring
- Type
- Software
- Quantity
- 4
- Needed from level
- 3.50
Semi automatic wire fabrication machine
- Type
- Machine
- Quantity
- TBD
- Needed from level
- 3.50
Wiring training 1 day
- Type
- Training
- Quantity
- 2
- Needed from level
- 3.50
EPLAN Pro Panel Production NC-DXF
- Type
- Software
- Quantity
- TBD
- Needed from level
- 4.00
Perforex NC machine
- Type
- Machine
- Quantity
- TBD
- Needed from level
- 4.00
Commissioning EPLAN interface to RSS machines
- Type
- Consultancy
- Quantity
- 1
- Needed from level
- 4.00
Copper Design Elements
- Type
- Software
- Quantity
- 2
- Needed from level
- 4.50
Secarex cutting machine
- Type
- Machine
- Quantity
- TBD
- Needed from level
- 4.50
Wire Terminal wire fabrication or external supplier
- Type
- Machine
- Quantity
- TBD
- Needed from level
- 4.50
Athex terminal strip machine
- Type
- Machine
- Quantity
- TBD
- Needed from level
- 5.00
Export report